After the initial meeting Isometrix Design Inc. would be retained for the purpose of:
Phase 1) design concept and budget
Phase 2) design development
Phase 3) construction, documentation and specifications
Phase 4) site supervision / design contract administration
Design Concept
- define vision and philosophy
- preliminary sketches / layouts
- review strategy / confirm process and direction
- confirm building code regulations and strata by-laws [where applicable]
- review and articulate the design concept
- confirm layout with as-builts and site anomalies
- presentation of sample boards, budgets & finishes for approval
Design Development
- design / layout drawings / finishes for sign off
- coordinate/tender contractors as required
- electrical consultant [if necessary]
- mechanical consultant [if necessary]
- structural consultant [if necessary]
- any other consultants as necessary
- coordinate / consult with potential general contractors
- coordinate art selection / installation plan [if necessary]
- design / discuss / coordinate interior / millwork / furniture
- begin outline specifications, including all materials and colours
- review budget / schedule
Construction Documentation
- revisions to drawings as required
- prepare documents, specifications and drawings for construction
- construction / millwork / furniture details
- coordination of consultant input
- coordinate consultant drawings
- coordinate with general contractor
- coordinate the order of items with long lead times
- review construction scheduling [prepared by others]
- review construction budget [prepared by others]
Site Supervision / Project Admin
- revisions / amendments to drawings as required
- review / amend construction plans as necessary
- initial site meetings with all major trades and general contractor
- informal and formal site visits with fabricators / suppliers
- regular client/site meetings / progress reviews / status reports
- clarifications / additional drawings / miscellaneous details
- shop drawing reviews
- change orders
- answer questions / document decisions
- deficiency assessment / instructions for correction
- one year post occupancy review [if requested]